NY Route 790


  • This is the suggested exit listing for my proposed NY Route 790.
  • The entire route would be in Oneida County.
  • As mentioned on my proposal, an Interstate designation would involve considerable construction west of Griffiss Park. This exit listing outlines my proposed exit locations.
  • I recommend that the exit numbers be based on distance, as this is the standard in 45 out of the 50 states.
  • With the eventual conversion to Interstate 790, the roadway between Thruway Exit 33 and Thruway Exit 31 would be entirely limited access. Any existing crossroad or intersection not listed below would either be bypassed (overpass/underpass) or removed.


NY Route 790 Suggested Exit List
MILE EASTBOUND EXITS
Read down
WESTBOUND EXITS
Read up
Notes
0

 

[JCT]
[NY 5]

 

 

[SPEED LIMIT 35]

 

 

TWO WAY TRAFFIC Exit listing does not include side streets in the Village of Oneida Castle.

 

[SPEED LIMIT 40] [SPEED LIMIT 35] Village of
Oneida Castle
1.0 [NY 465]
Oneida

AT GRADE INTERSECTION
TRAFFIC SIGNAL

With the renumbering of NY 365 as NY 790 in this area, NY 365A doesn't make sense. I recommend renumbering it to NY 465, maintaining some familiarity with local residents and cleverly indicating that it crosses NY 46 to NY 5.
1.4 Scanandoah Rd

AT GRADE INTERSECTION

 

1.6 [SPEED LIMIT 55] [SPEED LIMIT 40]

 

3.0 DIVIDED HIGHWAY
BEGINS
DIVIDED HIGHWAY
ENDS

 

3.4 Patrick Rd
Willow Place

AT GRADE INTERSECTION
TRAFFIC SIGNAL

 

3.6 Turning Stone Casino Resort

AT GRADE INTERSECTION
TRAFFIC SIGNAL

 

3.8 EXIT 4
[I-90] [Thruway]
Albany
Buffalo

 

4.8 EXIT 5
[NY 31]
Vernon
Verona
Vernon Downs
8.9 EXIT 9
Greenway-New London Rd

 

11.1 EXIT 11
[NY 26] [SOUTH]
To S James St
Rome
Correctional Facilities
13.1 EXIT 13
[NORTH] [NY 26]
[WEST] [NY 69]
Downtown Rome

LEFT EXIT

EXIT 13
[NY 26] [NORTH]
[NY 46] [WEST]
Downtown Rome
Fort Stanwix
Nat'l Monument
13.7 EXIT 14
[NY 69] [EAST] [NY 233]
Westmoreland

 

14.7 EXIT 15
[NY 365]
E Dominick St
Barneveld

 

 

15.5 AT GRADE RAILROAD CROSSING

 

15.7 [SPEED LIMIT 65] [SPEED LIMIT 55]

 

15.8 EXIT 16
[NY 825]
Griffiss Tech Park
Griffiss Int'l Airport
EXIT 16
[NY 365] [NY 825]
E Dominick St
Griffiss Tech Park
Griffiss Int'l Airport
With the implementation of Interstate and NY Routes 790, NY 365 would begin at this point and continue north to NY 8.
21.2 EXIT 21
Oriskany
Distribution Center
Psychiatric Center
Correctional Facilities
23.2 EXIT 23
[NY 291]
Stittville
Whitesboro
Marcy Business District
Correctional Facilities
Psychiatric Centers
24.3 EXIT 24
Cavanaugh Rd
Marcy

 

26.4 EXIT 26
Marcy-SUNY Pkwy
EXIT 26
Marcy-SUNY Pkwy
Marcy Business District
SUNY POLY
Marcy NanoCenter
27.1 [EAST] [END]
[I-790] [NY 790]
[END] [WEST]
[I-790] [NY 790]

 

27.1 EXITS 27 A-B
[NY 5] [NY 8] [NY 12]
Downtown Utica
Watertown
Binghamton
Adirondacks
27.9 EXIT 28 A
Genesee St SOUTH
[I-90] [Thruway]
Albany
Buffalo

 

 

28.1 EXIT 28 B
Genesee St NORTH
North Utica

 

 

28.1 [SPEED LIMIT 55] [SPEED LIMIT 65]

 

28.5 Leland Ave

AT GRADE INTERSECTION
TRAFFIC SIGNAL

 

 

MILE EASTBOUND EXITS
Read down
WESTBOUND EXITS
Read up
Notes